security-orchestra
Server Settings Edit how your server appears to other users in the marketplace and community.
От сообщества: Добавлен пользователем или импортирован; проверьте владельца перед подключениемРаботаетНужен API-ключГлобальныйБесплатноТолько чтение
Что умеет
- Get Capabilities: List all available workflows, chains, credit costs, and required parameters.
- Subdomain Discovery: Discover subdomains for a target domain using DNS brute-force, certificate transparency, and passive sources
- Asset Discovery: Map IP addresses, open ports, technologies, and cloud assets for a target domain
Какие данные видит
Нужен ли аккаунт
Нужен API-ключ из настроек сервиса
Server Settings Edit how your server appears to other users in the marketplace and community.
Display Name security-orchestra Description Enter a description for your server. You can use markdown formatting... Homepage https://smithery.ai The URL where users can find more information about this server.
Server Icon S Edit Upload a custom icon for your server. If no icon is uploaded, we will use the favicon from your homepage URL.
Список инструментов сервера (60)
Технические названия из tools/list. Нужны только разработчикам.
| get_capabilities | List all available workflows, chains, credit costs, and required parameters. |
| subdomain_discovery | Discover subdomains for a target domain using DNS brute-force, certificate transparency, and passive sources |
| asset_discovery | Map IP addresses, open ports, technologies, and cloud assets for a target domain |
| vulnerability_assessment | Run vulnerability scans against a target and return prioritized findings with remediation guidance |
| generator_sizing | Size generators for data center loads with industry-standard compliance. Returns genset kVA, fuel consumption, tank size, runtime, ATS sizing, and cost estimates. |
| utility_interconnect | Analyze utility interconnect requirements for major US power providers. Returns per-load-size timelines, deposit $/kW ranges, first-year cost, competitive intel, and constraint warnings. |
| pue_calculator | Calculate Power Usage Effectiveness (PUE) and efficiency metrics for data center facilities. Analyzes IT load, cooling systems, power distribution, and provides optimization recommendations. |
| construction_cost | Estimate construction costs for data center development. Analyzes $/MW costs, regional pricing factors, tier requirements, and provides detailed cost breakdowns for shell, electrical, mechanical, and IT infrastructure. |
| nfpa_110_checker | Check emergency generator compliance per NFPA 110 Level 1 and Level 2 requirements. Validates fuel capacity, ATS transfer time, runtime hours, and returns compliance status with violation details and remediation steps. |
| ats_sizing | Size automatic transfer switches per NEC Articles 700, 701, and 702. Calculates load current, applies 125% continuous load factor, selects standard ATS ratings, and returns enclosure options and installation requirements. |
| ups_sizing | Size uninterruptible power supplies per IEEE 485 and 1184. Calculates kVA, selects battery strings (VRLA or Li-ion), determines runtime across N/N+1/2N configurations, and provides cost estimates. |
| fuel_storage | Design diesel fuel storage systems for emergency generators. Calculates tank size, runtime, secondary containment, SPCC thresholds, NFPA 30 compliance, and day tank recommendations. |
| cooling_load | Calculate data center cooling load per ASHRAE TC 9.9. Computes IT heat, UPS losses, envelope gains, converts to tons, sizes CRAC/CRAH units with N+1 redundancy, and checks ASHRAE thermal envelopes. |
| power_density | Analyze rack power density for data centers. Classifies kW/rack density, sizes PDUs and branch circuits per NEC 645, calculates airflow requirements, and provides expansion capacity analysis. |
| redundancy_validator | Validate data center redundancy design against Uptime Institute Tier I–IV standards. Identifies single points of failure, assesses concurrent maintainability, and maps achieved tier with gaps to next level. |
| demand_response | Model utility demand response program participation for backup generator fleets. Calculates curtailment capacity, annual revenue, response time requirements, and program eligibility by utility. |
| environmental_impact | Assess environmental impact of data center generator operations. Calculates NOx/PM2.5/CO2 emissions per USEPA AP-42, air permit thresholds, CEQA/NEPA triggers, and mitigation requirements. |
| fire_suppression | Design clean agent fire suppression systems per NFPA 2001 and NFPA 75. Calculates agent quantity (FM-200, Novec 1230, Inergen, CO2), cylinder count, nozzle layout, and discharge time. |
| incentive_finder | Identify federal and state financial incentives for data center projects. Analyzes IRA tax credits, state grants, utility rebates, enterprise zone benefits, and job creation incentives by state. |
| noise_compliance | Analyze generator noise compliance with local ordinances. Calculates sound pressure levels at property line using inverse-square law, assesses zoning compliance, and recommends mitigation. |
| permit_timeline | Estimate permitting timeline and critical path for data center construction. Analyzes building, electrical, mechanical, fire, and environmental permits by jurisdiction type and project scope. |
| roi_calculator | Calculate return on investment for data center capital projects. Computes NPV, IRR, simple payback, discounted payback, and cumulative cash flow using DCF analysis. |
| tco_analyzer | Analyze total cost of ownership for data center operations. Breaks down power, cooling, labor, hardware refresh, maintenance, and facility costs over a multi-year horizon. |
| fiber_connectivity | Analyze fiber connectivity options and costs for a data center location. Evaluates carrier diversity, dark fiber vs lit services, latency to key markets, and redundancy paths. |
| harmonic_analysis | Perform harmonic analysis per IEEE 519 for data center power systems. Calculates total harmonic distortion (THD), voltage THD, and recommends filters and transformer derating. |
| site_scoring | Score and rank candidate data center sites across power, connectivity, risk, regulatory, and cost dimensions. Accepts a JSON array of site objects with attributes. |
| voltage_drop | Calculate voltage drop for data center power distribution circuits per NEC 210.19. Computes percent drop, conductor sizing recommendations, and NEC 647 compliance for sensitive loads. |
| water_availability | Assess water availability and consumption for data center cooling systems. Estimates daily/annual consumption, water stress risk, permit requirements, and recycled water options. |
| network_topology | Design spine-leaf network topology for data center switching fabric. Calculates spine/leaf switch counts, uplink ratios, oversubscription, port requirements, and cabling inventory. |
| bandwidth_sizing | Size north-south and east-west bandwidth for data center network fabric. Estimates aggregate throughput, uplink capacity, peering requirements, and recommends fabric speed. |
| latency_calculator | Calculate propagation latency for data center interconnects. Computes one-way and round-trip delay by medium (fiber, copper, wireless, microwave) and hop count. |
| ip_addressing | Design IP addressing and VLAN architecture for data center networks. Calculates subnet sizes with growth buffer, prefix lengths, VLAN counts, and management IP allocations. |
| dns_architecture | Design DNS architecture for data center environments. Recommends authoritative and recursive server counts, anycast deployment, DNSSEC requirements, and QPS capacity. |
| bgp_peering | Design BGP peering architecture for data center edge routing. Calculates route reflector requirements, memory for full tables, session counts, and convergence estimates. |
| physical_security | Design physical security systems for data centers per Uptime Institute tier standards. Calculates security zones, guard staffing, camera counts, access control points, and annual cost. |
| biometric_design | Design biometric access control systems for data center security zones. Calculates reader counts, FAR/FRR performance, throughput capacity, and enrollment database sizing. |
| surveillance_coverage | Design CCTV surveillance coverage for data center facilities. Calculates camera counts, field of view, storage requirements, and retention compliance for each resolution. |
| cybersecurity_controls | Map cybersecurity controls for data center compliance frameworks. Analyzes SOC 2, ISO 27001, NIST CSF, PCI DSS, and FedRAMP control requirements, SIEM sizing, and implementation effort. |
| compliance_checker | Check multi-framework compliance posture for data center operations. Identifies control overlaps, gaps, and prioritized remediation across simultaneous compliance programs. |
| chiller_sizing | Size water-cooled and air-cooled chillers for data center cooling plants. Calculates cooling tons, chiller plant configuration, N+1/2N sizing, and annual energy consumption. |
| crac_vs_crah | Compare CRAC vs CRAH unit selection for data center cooling. Analyzes EER/COP differences, annual energy cost, water availability constraints, and recommends optimal configuration. |
| airflow_modeling | Model airflow patterns for data center hot/cold aisle containment. Estimates CFM requirements, delta-T across racks, bypass airflow percentage, and hotspot risk by containment type. |
| humidification | Design humidification and dehumidification systems per ASHRAE A1 envelope. Calculates moisture load, equipment capacity, energy consumption, and seasonal control strategy. |
| economizer_analysis | Analyze economizer free-cooling potential for data center locations. Estimates annual free-cooling hours by climate, blended PUE improvement, energy savings, and simple payback. |
| construction_timeline | Estimate construction timeline for data center development projects. Provides phase-by-phase schedule (design, permits, civil, MEP, commissioning) with state-specific regulatory modifiers. |
| commissioning_plan | Generate commissioning plan per ASHRAE Guideline 1.2 for data center infrastructure. Calculates Level 1–4 test hours, witness testing requirements, and integrated systems testing scope. |
| maintenance_schedule | Build annual preventive maintenance schedule for data center infrastructure. Calculates PM labor hours, intervals, and annual cost for generators, UPS, cooling, and electrical systems. |
| capacity_planning | Project data center capacity runway and expansion trigger points. Uses logarithmic growth modeling to forecast years to 80% utilization, critical threshold, and end-of-design-life load. |
| sla_calculator | Calculate SLA availability metrics against Uptime Institute tier benchmarks. Computes allowed downtime minutes/year, MTTR budget, and compliance status for target availability percentage. |
| change_management | Design change management process for data center operations. Defines CAB frequency, change windows, rollback SLA, and staffing model based on tier classification and change volume. |
| carbon_footprint | Calculate data center carbon footprint per GHG Protocol Scope 2. Computes location-based and market-based emissions using eGRID factors, renewable energy certificates, and carbon intensity. |
| solar_feasibility | Assess rooftop solar PV feasibility for data center facilities. Calculates system capacity, annual generation, energy offset percentage, IRA tax credit (30%), and simple payback. |
| battery_storage | Size battery energy storage systems for data center applications. Supports Li-ion, LFP, VRLA, and flow chemistries for UPS backup, peak shaving, demand response, and islanding use cases. |
| energy_procurement | Analyze energy procurement strategies for large data center loads. Compares utility tariffs, PPAs, green tariffs, and direct access contracts with estimated annual cost and renewable content. |
| tier_certification_checker | Evaluate data center readiness for Uptime Institute Tier I–IV certification. Produces a gap analysis with remediation costs, readiness score, and priority steps. This is a readiness assessment, not official certification. |
| nc_utility_interconnect | Model the interconnect application process for Duke Energy Progress, Duke Energy Carolinas, or Dominion Energy NC. Returns utility-specific steps, timeline, fees, NCUC filing requirements, and data center considerations. |
| get_grid_telemetry | Fetch real-time grid telemetry (demand, net generation, reserve margin) for a US balancing authority using the free EIA v2 API. Supports ERCO (ERCOT/Texas) and PJM (Mid-Atlantic/Midwest). EIA normalizes both regions into identical JSON so your agent never has to parse different schemas. |
| get_active_weather_alerts | Fetch active severe weather alerts for any US state from the National Weather Service API (no API key required). Returns alert count, severity, urgency, event types, and pre-computed threat flags (has_thunderstorm, has_tornado, has_hurricane, has_winter_storm, has_extreme_heat) for automated threat scoring. |
| chain_full_power_analysis | Generator sizing → NFPA 110 compliance → UPS sizing → ROI calculator. Complete power infrastructure analysis in one request. |
| chain_site_readiness | Site scoring → Tier certification → Utility interconnect → Compliance check. Full site evaluation pipeline. |