security-orchestra
Server Settings Edit how your server appears to other users in the marketplace and community.
Community: Submitted by a user or imported; check the owner before granting accessOnlineAPI key requiredGlobalFreeRead-only
What it can do
- Get Capabilities: List all available workflows, chains, credit costs, and required parameters.
- Subdomain Discovery: Discover subdomains for a target domain using DNS brute-force, certificate transparency, and passive sources
- Asset Discovery: Map IP addresses, open ports, technologies, and cloud assets for a target domain
What data it sees
Do you need an account
An API key from the service settings is required
Server Settings Edit how your server appears to other users in the marketplace and community.
Display Name security-orchestra Description Enter a description for your server. You can use markdown formatting... Homepage https://smithery.ai The URL where users can find more information about this server.
Server Icon S Edit Upload a custom icon for your server. If no icon is uploaded, we will use the favicon from your homepage URL.
Server tool list (60)
Raw names from tools/list. Only developers need these.
| get_capabilities | List all available workflows, chains, credit costs, and required parameters. |
| subdomain_discovery | Discover subdomains for a target domain using DNS brute-force, certificate transparency, and passive sources |
| asset_discovery | Map IP addresses, open ports, technologies, and cloud assets for a target domain |
| vulnerability_assessment | Run vulnerability scans against a target and return prioritized findings with remediation guidance |
| generator_sizing | Size generators for data center loads with industry-standard compliance. Returns genset kVA, fuel consumption, tank size, runtime, ATS sizing, and cost estimates. |
| utility_interconnect | Analyze utility interconnect requirements for major US power providers. Returns per-load-size timelines, deposit $/kW ranges, first-year cost, competitive intel, and constraint warnings. |
| pue_calculator | Calculate Power Usage Effectiveness (PUE) and efficiency metrics for data center facilities. Analyzes IT load, cooling systems, power distribution, and provides optimization recommendations. |
| construction_cost | Estimate construction costs for data center development. Analyzes $/MW costs, regional pricing factors, tier requirements, and provides detailed cost breakdowns for shell, electrical, mechanical, and IT infrastructure. |
| nfpa_110_checker | Check emergency generator compliance per NFPA 110 Level 1 and Level 2 requirements. Validates fuel capacity, ATS transfer time, runtime hours, and returns compliance status with violation details and remediation steps. |
| ats_sizing | Size automatic transfer switches per NEC Articles 700, 701, and 702. Calculates load current, applies 125% continuous load factor, selects standard ATS ratings, and returns enclosure options and installation requirements. |
| ups_sizing | Size uninterruptible power supplies per IEEE 485 and 1184. Calculates kVA, selects battery strings (VRLA or Li-ion), determines runtime across N/N+1/2N configurations, and provides cost estimates. |
| fuel_storage | Design diesel fuel storage systems for emergency generators. Calculates tank size, runtime, secondary containment, SPCC thresholds, NFPA 30 compliance, and day tank recommendations. |
| cooling_load | Calculate data center cooling load per ASHRAE TC 9.9. Computes IT heat, UPS losses, envelope gains, converts to tons, sizes CRAC/CRAH units with N+1 redundancy, and checks ASHRAE thermal envelopes. |
| power_density | Analyze rack power density for data centers. Classifies kW/rack density, sizes PDUs and branch circuits per NEC 645, calculates airflow requirements, and provides expansion capacity analysis. |
| redundancy_validator | Validate data center redundancy design against Uptime Institute Tier I–IV standards. Identifies single points of failure, assesses concurrent maintainability, and maps achieved tier with gaps to next level. |
| demand_response | Model utility demand response program participation for backup generator fleets. Calculates curtailment capacity, annual revenue, response time requirements, and program eligibility by utility. |
| environmental_impact | Assess environmental impact of data center generator operations. Calculates NOx/PM2.5/CO2 emissions per USEPA AP-42, air permit thresholds, CEQA/NEPA triggers, and mitigation requirements. |
| fire_suppression | Design clean agent fire suppression systems per NFPA 2001 and NFPA 75. Calculates agent quantity (FM-200, Novec 1230, Inergen, CO2), cylinder count, nozzle layout, and discharge time. |
| incentive_finder | Identify federal and state financial incentives for data center projects. Analyzes IRA tax credits, state grants, utility rebates, enterprise zone benefits, and job creation incentives by state. |
| noise_compliance | Analyze generator noise compliance with local ordinances. Calculates sound pressure levels at property line using inverse-square law, assesses zoning compliance, and recommends mitigation. |
| permit_timeline | Estimate permitting timeline and critical path for data center construction. Analyzes building, electrical, mechanical, fire, and environmental permits by jurisdiction type and project scope. |
| roi_calculator | Calculate return on investment for data center capital projects. Computes NPV, IRR, simple payback, discounted payback, and cumulative cash flow using DCF analysis. |
| tco_analyzer | Analyze total cost of ownership for data center operations. Breaks down power, cooling, labor, hardware refresh, maintenance, and facility costs over a multi-year horizon. |
| fiber_connectivity | Analyze fiber connectivity options and costs for a data center location. Evaluates carrier diversity, dark fiber vs lit services, latency to key markets, and redundancy paths. |
| harmonic_analysis | Perform harmonic analysis per IEEE 519 for data center power systems. Calculates total harmonic distortion (THD), voltage THD, and recommends filters and transformer derating. |
| site_scoring | Score and rank candidate data center sites across power, connectivity, risk, regulatory, and cost dimensions. Accepts a JSON array of site objects with attributes. |
| voltage_drop | Calculate voltage drop for data center power distribution circuits per NEC 210.19. Computes percent drop, conductor sizing recommendations, and NEC 647 compliance for sensitive loads. |
| water_availability | Assess water availability and consumption for data center cooling systems. Estimates daily/annual consumption, water stress risk, permit requirements, and recycled water options. |
| network_topology | Design spine-leaf network topology for data center switching fabric. Calculates spine/leaf switch counts, uplink ratios, oversubscription, port requirements, and cabling inventory. |
| bandwidth_sizing | Size north-south and east-west bandwidth for data center network fabric. Estimates aggregate throughput, uplink capacity, peering requirements, and recommends fabric speed. |
| latency_calculator | Calculate propagation latency for data center interconnects. Computes one-way and round-trip delay by medium (fiber, copper, wireless, microwave) and hop count. |
| ip_addressing | Design IP addressing and VLAN architecture for data center networks. Calculates subnet sizes with growth buffer, prefix lengths, VLAN counts, and management IP allocations. |
| dns_architecture | Design DNS architecture for data center environments. Recommends authoritative and recursive server counts, anycast deployment, DNSSEC requirements, and QPS capacity. |
| bgp_peering | Design BGP peering architecture for data center edge routing. Calculates route reflector requirements, memory for full tables, session counts, and convergence estimates. |
| physical_security | Design physical security systems for data centers per Uptime Institute tier standards. Calculates security zones, guard staffing, camera counts, access control points, and annual cost. |
| biometric_design | Design biometric access control systems for data center security zones. Calculates reader counts, FAR/FRR performance, throughput capacity, and enrollment database sizing. |
| surveillance_coverage | Design CCTV surveillance coverage for data center facilities. Calculates camera counts, field of view, storage requirements, and retention compliance for each resolution. |
| cybersecurity_controls | Map cybersecurity controls for data center compliance frameworks. Analyzes SOC 2, ISO 27001, NIST CSF, PCI DSS, and FedRAMP control requirements, SIEM sizing, and implementation effort. |
| compliance_checker | Check multi-framework compliance posture for data center operations. Identifies control overlaps, gaps, and prioritized remediation across simultaneous compliance programs. |
| chiller_sizing | Size water-cooled and air-cooled chillers for data center cooling plants. Calculates cooling tons, chiller plant configuration, N+1/2N sizing, and annual energy consumption. |
| crac_vs_crah | Compare CRAC vs CRAH unit selection for data center cooling. Analyzes EER/COP differences, annual energy cost, water availability constraints, and recommends optimal configuration. |
| airflow_modeling | Model airflow patterns for data center hot/cold aisle containment. Estimates CFM requirements, delta-T across racks, bypass airflow percentage, and hotspot risk by containment type. |
| humidification | Design humidification and dehumidification systems per ASHRAE A1 envelope. Calculates moisture load, equipment capacity, energy consumption, and seasonal control strategy. |
| economizer_analysis | Analyze economizer free-cooling potential for data center locations. Estimates annual free-cooling hours by climate, blended PUE improvement, energy savings, and simple payback. |
| construction_timeline | Estimate construction timeline for data center development projects. Provides phase-by-phase schedule (design, permits, civil, MEP, commissioning) with state-specific regulatory modifiers. |
| commissioning_plan | Generate commissioning plan per ASHRAE Guideline 1.2 for data center infrastructure. Calculates Level 1–4 test hours, witness testing requirements, and integrated systems testing scope. |
| maintenance_schedule | Build annual preventive maintenance schedule for data center infrastructure. Calculates PM labor hours, intervals, and annual cost for generators, UPS, cooling, and electrical systems. |
| capacity_planning | Project data center capacity runway and expansion trigger points. Uses logarithmic growth modeling to forecast years to 80% utilization, critical threshold, and end-of-design-life load. |
| sla_calculator | Calculate SLA availability metrics against Uptime Institute tier benchmarks. Computes allowed downtime minutes/year, MTTR budget, and compliance status for target availability percentage. |
| change_management | Design change management process for data center operations. Defines CAB frequency, change windows, rollback SLA, and staffing model based on tier classification and change volume. |
| carbon_footprint | Calculate data center carbon footprint per GHG Protocol Scope 2. Computes location-based and market-based emissions using eGRID factors, renewable energy certificates, and carbon intensity. |
| solar_feasibility | Assess rooftop solar PV feasibility for data center facilities. Calculates system capacity, annual generation, energy offset percentage, IRA tax credit (30%), and simple payback. |
| battery_storage | Size battery energy storage systems for data center applications. Supports Li-ion, LFP, VRLA, and flow chemistries for UPS backup, peak shaving, demand response, and islanding use cases. |
| energy_procurement | Analyze energy procurement strategies for large data center loads. Compares utility tariffs, PPAs, green tariffs, and direct access contracts with estimated annual cost and renewable content. |
| tier_certification_checker | Evaluate data center readiness for Uptime Institute Tier I–IV certification. Produces a gap analysis with remediation costs, readiness score, and priority steps. This is a readiness assessment, not official certification. |
| nc_utility_interconnect | Model the interconnect application process for Duke Energy Progress, Duke Energy Carolinas, or Dominion Energy NC. Returns utility-specific steps, timeline, fees, NCUC filing requirements, and data center considerations. |
| get_grid_telemetry | Fetch real-time grid telemetry (demand, net generation, reserve margin) for a US balancing authority using the free EIA v2 API. Supports ERCO (ERCOT/Texas) and PJM (Mid-Atlantic/Midwest). EIA normalizes both regions into identical JSON so your agent never has to parse different schemas. |
| get_active_weather_alerts | Fetch active severe weather alerts for any US state from the National Weather Service API (no API key required). Returns alert count, severity, urgency, event types, and pre-computed threat flags (has_thunderstorm, has_tornado, has_hurricane, has_winter_storm, has_extreme_heat) for automated threat scoring. |
| chain_full_power_analysis | Generator sizing → NFPA 110 compliance → UPS sizing → ROI calculator. Complete power infrastructure analysis in one request. |
| chain_site_readiness | Site scoring → Tier certification → Utility interconnect → Compliance check. Full site evaluation pipeline. |