
kanban-todo-tasks-projects-board
A local task board per project: columns, due dates, estimates, priorities, overdue, weekly review.
What it can do
What data it sees
Do you need an account
An API key from the service settings is required
A local task board per project: columns, due dates, estimates, priorities, overdue, weekly review.
How to connect
How to connect kanban-todo-tasks-projects-board to Claude
The server address to paste into Claude settings:
https://mcp.zovo.one/mcp/kanban
- Open Claude (claude.ai or the desktop app).
- Go to Settings → Connectors.
- Click Add custom connector.
- Paste the server address copied below into Remote MCP server URL and click Add.
- In a chat, click + → Connectors and switch the new connector on.
Custom connectors are available on Free, Pro, Max, Team and Enterprise plans (Free is limited to one). On Team and Enterprise an organization Owner adds the connector first under Organization settings → Connectors.
Authorization
After you click Add, a sign-in window for the service opens. Sign in with your own account and approve access. Claude never sees your password.
How to connect kanban-todo-tasks-projects-board to ChatGPT
The server address to paste into ChatGPT settings:
https://mcp.zovo.one/mcp/kanban
- Open ChatGPT in a browser (chatgpt.com). A Plus, Pro, Business, Enterprise or Edu plan is required.
- Turn on developer mode once: Settings → Apps → Advanced settings → Developer mode.
- Open Settings → Connectors and click Create.
- Fill in the form: Name (anything), Description (one line about what the service does), MCP server URL (copy it below).
- Under Authentication choose OAuth if the service requires sign-in, otherwise None. Click Create.
- In a new chat open + → Apps/Connectors and enable the connector.
OpenAI has renamed this section before (Connectors → Apps/Plugins). If the label differs, search settings for "developer mode". On Business/Enterprise workspaces an admin must allow custom connectors first.
Authorization
On first use ChatGPT opens the service's sign-in window. Sign in and approve access.
How to connect kanban-todo-tasks-projects-board to Cursor
The server address to paste into Cursor settings:
https://mcp.zovo.one/mcp/kanban
Fastest: click Open in Cursor below and confirm the prompt.
Manually:
- In Cursor open Settings → Cursor Settings → MCP and click Add new global MCP server.
- Paste the JSON copied below into
~/.cursor/mcp.json(per project:.cursor/mcp.jsonin the repo root). - Save the file. The server appears in the MCP list; authorize it there if asked.
Authorization
If the service needs sign-in, an authorize button appears next to the server in the MCP list.
Server tool list (17)
Raw names from tools/list. Only developers need these.
| license_status | Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes. |
| license_activate | Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it. |
| task_add | Add one task to a board and return its id, board and column. The board is created on first use, so pass an existing project or leave it out. An identical open task is refused. Free: 3 boards, 200 open. |
| task_list | List tasks as a table of id, project, column, title, priority, due, estimate, actual and tags, sorted by due date, with the total estimate. Done tasks are left out unless include_done. 200 rows default. |
| task_move | Move one task to another column of its own board and report the old and new column. An unknown column is refused, listing the real ones. Entering the done column stamps completion; leaving it clears it. |
| task_update | Change a task by id: only the fields you pass are touched. tags REPLACES the whole list, due 'none' clears it, and project moves the task to a board that already exists. Returns the task's new row. |
| task_done | Mark one task finished: it moves to the board's done column (named done, else the last) and is stamped, leaving task_list and the open counts. Returns estimate against actual when both are known. |
| task_delete | Delete one task by id, permanently; the id is never reused. The answer names any logged minutes lost. time-tracker entries are a separate store and are untouched. Use task_done to keep the record. |
| task_search | Find tasks whose id, title, notes or tags contain the query, across every board, finished ones included. Plain case-insensitive substring, never a regex. Use task_list for structured filters. |
| board | Show one board column by column: tasks, estimate, actual and overdue count in each, then the board totals and the estimate still open. Defaults to your busiest board. Use project_list for every board. |
| task_start_timer | Return the exact arguments to pass to the time-tracker's timer_start for one task, and record the link here. It starts nothing itself, and warns when the tracker's own project names would misfile the time. |
| task_log_time | Add real minutes worked to one task so estimate and actual can be compared. Minutes ADD; a negative corrects an over-count. Below zero or past 100,000 is refused. This counter is the board's own. |
| project_list | List every board with its task-id prefix, open and done counts, estimate still open and overdue count, plus free-tier use (3 boards, 200 open tasks). Use board for one board broken down by column. |
| project_delete | Delete an empty board and give its free-tier slot back. A board still holding tasks, open or done, is refused with one named, because task_add creates boards as a side effect and the work would be lost. |
| overdue | List every task whose due day is already past, across all boards, oldest first, in the task_list table. as_of measures against a day you name. A finished task, or one with no due date, never counts. |
| weekly_review | Compare done against planned for one ISO week per project: how many were due, how many of those are finished, how many were completed, and estimate against actual minutes. Any week but this one is Pro. |
| columns_set | Replace one board's columns, in order, with 2 to 12 unique names. Tasks in a removed column move to the FIRST column. Blanks are dropped first, so a list normalising below two names is refused. Pro. |